What are the standard trade terms available?
We support FOB, CIF, and FCA trade terms for international shipping.
What is the required payment structure?
Our standard terms are T/T 40% deposit in advance and T/T 60% against the B/L copy.
Can I request samples for quality testing?
Yes, we provide 1-2 pieces of samples free of charge. The recipient is responsible for the express shipping costs.
What is the typical lead time for production?
Mass production usually takes 30-35 days, while sample lead time is within 7 days.
How is product quality guaranteed?
We maintain a strict quality control system and a professional QC team to inspect every production stage.
Are the drawer slides tested for durability?
Yes, our slides have passed SGS testing, 48-hour salt spray tests, and 50,000 open-close cycle tests.