Winstar Twinkle Stainless Steel Sofa Armrest Gold Home Decorative Hardware Accessories

Customization: Available
Material: Metal
Adjustable: Adjustable

Product Description

📋 Basic Information
Model NO.
ZD-SH02
Application
Office Chair / Sofa
MOQ
30
Design Style
Modern Luxury
Dimensions
61*53*59cm
Color Options
Golden, Rose Golden
Origin
China
HS Code
7308400000
🔍 Product Description
Production CodeZD-SH02
Main MaterialStainless Steel
UsageSofa, Chair Hardware
StyleLuxury, Noble
ColorGolden, Rose Golden
Standard SizeL250*W150*H650mm
Payment TermT/T with 30% deposit, 70% balance before loading.
RemarkCustomized styles available based on requirements.
📸 Detailed Photos
⭐ Best Selling Legs Series
Furniture Leg Series
🏭 Production & Logistics
Factory View
Packaging and Shipping
🛠️ Service & Support
1) Quick Response: Inquiries are handled within 24 hours.
2) Free Samples: Samples are available for testing within 3-5 days.
3) Flexible Delivery: Typical lead time is 10-22 days depending on quantity.
4) Multiple Payment Options: T/T, Western Union, and Cash accepted.
5) Custom Design: OEM and customized product designs are welcomed.
❓ Frequently Asked Questions
What material is used for the ZD-SH02 armrest?
The armrest is manufactured using high-quality stainless steel, ensuring durability and a premium luxury finish.
What color finishes are available?
The standard color options are Golden and Rose Golden, which are designed to provide a noble and modern aesthetic.
Is customization available for different styles?
Yes, we are able to accept and customize various styles according to your specific interests and requirements.
How long does it take for samples to be ready?
Samples for testing are generally available within 3 to 5 days and are provided free of charge.
What is the standard production and delivery timeline?
Once an order is confirmed, shipment is typically loaded within 10 to 22 days, depending on the total order quantity.
What are the standard payment terms for bulk orders?
The standard terms are T/T with a 30% deposit required before production and the remaining 70% balance due before loading.

Related Products